.Crystal City / Potomac Yard Transit Improvements
             
   
   

Reports and Publications

xx1. Environmental Review

  • NEW! FTA approval letter.

  • NEW! Categorical Exclusion final checklist.

  • NEW! Categorical Exclusion and supporting technical memoranda:

    * Note: many of the files on this page are large; please allow ample time for download.

    CONTENTS
    Final Categorical Exclusion
    Planned Alignment [3 MB]
    Alexandria Zoning [4 MB]
    Arlington Zoning [4 MB]
    TPB Steering Committee Actions: TIP Amendment [4 MB]

    Transportation Effects [11 MB]
    Air Quality [9 MB]
    Cultural Resources [12 MB]
    Historic Resources Project Review [7 MB]
    Historic Resources Agency Correspondence
    Noise and Vibration [8 MB]
    Environmental Records [3 MB]
    Environmental Site Assessment [13 MB]
    Socioeconomics [22 MB]
    Water Resources [4 MB]
    Coastal Zone Management Consistency [3 MB]
    Coastal Zone Management Correspondence [1 MB]
    Additional Correspondence [1 MB]
    Public Meeting Report
    Postcard
    Flyer [1 MB]
    Project Brochure [3 MB]

  • Two-page summary (PDF) of the October 16, 2006, Public Information Meeting.

  • Materials displayed at the public information meeting. Click on the following link to see PDFs of the presentation [4 MB], the project brochure [3 MB] and insert, the comment form, and display boards:

    * Note: many of the files on this page are large; please allow ample time for download.

    Segment A: Alexandria, Route 1 South [7 MB]
    Segment B: Alexandria, Route 1, Curbside Bus Lanes [7 MB]
    Segment B: Alexandria, Route 1, Median Busway [7 MB]
    Segment C: Alexandria, Potomac Yard [7 MB]
    Segment D: Arlington, Potomac Yard [9 MB]
    Segment E: Arlington, Crystal City [9 MB]
    Segment F: Arlington, Pentagon [11 MB]
    Purpose of the project and the environmental review [1 MB]
    Maps of the planned alignment [3 MB]
    Traffic effects and level-of-service analysis [3 MB]
    Transit service—effects, performance, and operating plan [3 MB]


    2. Implementation Strategy Study

  • The Crystal City/Potomac Yard Corridor Interim Improvement Project Summary. This 11-page report, dated December 2005, is a technical memorandum that outlines the phased service improvements in the corridor, station stops and amenities, project development and implementation, estimated capital and operating costs, and what steps will be taken next in the project.

  • The Crystal City/Potomac Yard Transit Improvement Project Environmental Scan. This 17-page report, dated November 2005, is a technical memorandum that documents potential impacts to the study area as a result of the proposed transit system. The environmental scan looks at soils, air quality, noise and vibration, water resources, protected species and critical habitats, environmental justice, parklands, hazardous and contaminated materials, neighborhood and community impacts, property acquisition and displacement, historic and cultural resources, safety and security, and energy consumption.
  • The Crystal City/Potomac Yard Transit Connection. This community newsletter, from Spring 2005, was distributed to members of the local community in Alexandria and Arlington. The newsletter features articles on the purpose of and need for transit improvements in the corridor, the project implementation plan, and operational characteristics of state-of-the-art transit systems.

    3. Alternatives Analysis

  • The Crystal City/Potomac Yard Corridor Transit Alternatives Analysis Final Report (see links below). This March 2003 report, published by the Virginia Department of Rail and Public Transportation, contains an overview of the project and study area and explores the project's purpose and need, alternative transit technologies, potential maintenance facilities, and investment strategies. Central to the document are the identification of evaluation criteria, an analysis of the alternatives based on that criteria, and study recommendations. Because of the large size of the Alternatives Analysis, the document has been split here into five separate PDFs:

    - Contents, Executive Summary, Sections 1-4 [9 MB]
    - Sections 5-9 [11 MB]
    - Sections 10-11 [3 MB]
    - Appendices A-F [6 MB]
    - Appendices G-L [9 MB]


    4. Other Studies

  • A related document, the Crystal City Metrorail Station Access Study final report, is also available. Prepared by Arlington County and the Washington Metropolitan Area Transit Authority (Metro) in 2002, the study makes recommendations for improvements to the Crystal City Metro Station, including station entrances, pedestrian and bicycle facilities, and internal station enhancements. A slide presentation [4 MB] of the study can also be downloaded.

    For further information on the Crystal City/Potomac Yard Corridor Alternatives Analysis and Transit Improvements Project, please visit the City of Alexandria's Department of Transportation and Environmental Services Development Studies page. And for general information about transportation and transit in Arlington, please visit the county's Department of Environmental Services Transportation Index Page.

    More reports and publications will be posted to this page as the study progresses, so please bookmark the website and visit again for the latest information on this important transit project!



Click above to see a PDF of the project flyer that
was mailed and e-mailed to about 800 community
members and policymakers in Alexandria and
Arlington in Summer 2006.

The Crystal City/Potomac Yard Transit Connection
Community Newsletter



The Crystal City Metro Access Final Report

 

 

 

xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx© 2006, 2007 Washington Metropolitan Area Transit Authority