Reports
and Publications
xx1.
Environmental Review
- NEW! FTA
approval letter.
- NEW! Categorical Exclusion
final checklist.
- NEW! Categorical Exclusion
and supporting technical memoranda:
* Note: many of the files on this
page are large; please allow ample time for download.
— CONTENTS
— Final Categorical
Exclusion
— Planned
Alignment [3 MB]
— Alexandria
Zoning [4 MB]
— Arlington
Zoning [4 MB]
— TPB
Steering Committee Actions: TIP Amendment [4
MB]
— Transportation
Effects [11 MB]
— Air Quality [9
MB]
— Cultural
Resources [12
MB]
— Historic
Resources Project Review [7
MB]
— Historic
Resources Agency Correspondence
— Noise
and Vibration [8
MB]
— Environmental
Records [3
MB]
— Environmental
Site Assessment [13
MB]
— Socioeconomics [22
MB]
— Water Resources [4
MB]
— Coastal
Zone Management Consistency [3
MB]
— Coastal
Zone Management Correspondence [1
MB]
— Additional Correspondence [1
MB]
— Public
Meeting Report
— Postcard
— Flyer [1
MB]
— Project
Brochure [3
MB]
- Two-page summary (PDF) of
the October 16, 2006, Public Information Meeting.
- Materials displayed at the public information
meeting. Click on the following link to see PDFs of the presentation [4
MB], the project brochure [3
MB] and insert,
the comment
form,
and display boards:
* Note: many of the files on this page are large; please allow
ample time for download.
— Segment A:
Alexandria, Route 1 South [7 MB]
— Segment
B: Alexandria, Route 1, Curbside Bus Lanes [7 MB]
— Segment
B: Alexandria, Route 1, Median Busway [7 MB]
— Segment C:
Alexandria, Potomac Yard [7 MB]
— Segment D:
Arlington, Potomac Yard [9 MB]
— Segment E:
Arlington, Crystal City [9 MB]
— Segment F:
Arlington, Pentagon [11 MB]
— Purpose of
the project and the environmental review [1 MB]
— Maps of
the planned alignment [3 MB]
— Traffic effects
and level-of-service analysis [3 MB]
— Transit service—effects,
performance, and operating plan [3 MB]
2. Implementation
Strategy Study
- The Crystal City/Potomac Yard Corridor
Interim Improvement Project Summary.
This 11-page report, dated December 2005, is a technical memorandum
that outlines the phased
service improvements in the corridor, station stops and amenities,
project development and implementation, estimated capital and operating
costs,
and what steps will be taken next in the project.
- The Crystal City/Potomac Yard Transit
Improvement Project Environmental
Scan. This 17-page report, dated November 2005,
is a technical memorandum that documents potential impacts to
the study area as a
result of the proposed transit system. The environmental scan
looks at soils, air quality, noise and vibration, water resources,
protected
species and critical habitats, environmental justice, parklands,
hazardous and contaminated materials, neighborhood and community
impacts, property
acquisition and displacement, historic and cultural resources,
safety and security, and energy consumption.
- The Crystal City/Potomac Yard Transit
Connection. This community newsletter, from Spring 2005,
was distributed to members of the local community in Alexandria and
Arlington. The newsletter features articles on the purpose of and need
for transit improvements in the corridor, the project implementation
plan, and operational characteristics of state-of-the-art transit systems.
3. Alternatives Analysis
- The Crystal City/Potomac Yard Corridor
Transit Alternatives Analysis Final Report (see
links below). This March 2003 report, published by the Virginia Department
of Rail and
Public
Transportation,
contains
an overview of the project and study area and explores the project's
purpose and need, alternative transit technologies, potential maintenance
facilities, and investment strategies. Central to the document are
the identification of evaluation criteria, an analysis of the alternatives
based on that criteria, and study recommendations. Because of the
large size of the Alternatives Analysis, the document has been split
here into five separate PDFs:
- Contents, Executive Summary, Sections 1-4 [9
MB]
- Sections 5-9 [11
MB]
- Sections 10-11 [3
MB]
- Appendices A-F [6
MB]
- Appendices G-L [9
MB]
4. Other Studies
- A related document, the Crystal
City Metrorail Station Access Study final report,
is also available. Prepared by Arlington County and the Washington
Metropolitan Area Transit Authority (Metro) in 2002, the study
makes recommendations for improvements to the Crystal City Metro
Station, including station entrances, pedestrian and
bicycle facilities, and internal station enhancements. A slide
presentation [4 MB] of the study can also be downloaded.
For further information on the Crystal City/Potomac
Yard Corridor Alternatives Analysis and Transit Improvements
Project, please visit the City of Alexandria's Department of Transportation
and Environmental Services Development
Studies page. And for general information about
transportation and transit in Arlington, please visit the county's Department
of Environmental Services Transportation
Index Page.
More reports and publications will be posted
to this page as the study progresses, so please bookmark the website
and
visit
again for the latest information on this important transit project!
|

Click above to see a PDF of the project flyer that
was mailed
and e-mailed to
about 800 community
members and policymakers in Alexandria and
Arlington
in Summer 2006.
|